MIL-DTL-85405A(AS)
4.8 Non-destructive testing. Magnetic particle (see 4.6) and dye penetrant (see 4.7) testing
shall be performed on all stress weld areas at completion of all the aforementioned tests on the
first article unit and at the discretion of the Government inspector.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in
the contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD
personnel, these personnel need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the Inventory Control Point's
packaging activity within the Military Department or Defense Agency, or within the Military
Department's System Command. Packaging data retrieval is available from the managing Military
Department's or Defense Agency's automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be helpful,
but is not mandatory.)
6.1 Intended use. The MHU-185/M Munitions Trailer is intended for use at Navy shorebase
stations to transport munitions and practice bombs from magazine to aircraft, for rocket build-up
and transport, and general utility usage.
6.2 Ordering data. Procurement documents should specify the following:
a. Title, Number, and Date of this Specification.
b. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2 and 2.3).
c. Whether first article inspection is required (see 3.2 and 6.3).
d. Sampling inspection (see 4.4)
e. Packaging requirements (see 5.1).
6.3 First article provision. When first article samples are required, the manufacture of the
trailer on the contract should not commence until the samples submitted are pronounced
satisfactory by the acquiring activity. The submission of further first article samples on
subsequent contracts may be waived at the discretion of the acquiring activity. Approval of first
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business