MIL-DTL-85537A(AS)
d. Sampling inspection (see 4.4).
e. Selection of applicable levels of preservation and packaging required (see 5.1).
6.3 First article provision. When first article samples are required, the construction of the
trailer on the contract should not commence until the samples submitted are pronounced
satisfactory by the acquiring activity. The submission of further first article samples on
subsequent contracts may be waived at the discretion of the acquiring activity. Approval of first
article samples or the waiving of first article tests does not eliminate the requirements of
conformance inspection (see 4.3). The contracting officer should include specific instructions in
acquisition documents regarding arrangements for examinations and test approval of the first
article. Further information can be obtained from the Commander, Naval Air Warfare Center
Aircraft Division, Code 4.8.1.2, M/S 562-3, Highway 547, Lakehurst,
NJ 08733-5033.
6.4 Subject term (key word) listing.
Ammunition
Bombs
Loader
Magazine
Ordnance
Vehicle
Weapons
6.5 Changes from previous issue. Marginal notations are not used in this revision to identify
changes with respect to the previous issue due to the extent of the changes..
CONCLUDING MATERIAL
Preparing Activity:
Navy - AS
(Project 1740-0183)
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business